Tariffs

What is City of Tshwane’s SSEG export credit in 2026/27?

NERSA’s City of Tshwane FY2026/27 RfD recommends a residential SSEG “credit reverse” of 94.13 c/kWh excl. VAT (≈108.25 c incl.) from 1 July 2026, with domestic SSEG fixed lines rising to R324.00/month excl. (≈R372.60 incl.). The City FAQ still showed an older ~11.99 c figure when last checked — confirm the live credit with sseg@tshwane.gov.za and your bi-directional statement before you model payback.

Updated 27 October 2026 · Illustrative ranges — not a formal quote, credit decision or legal advice.

Answer first: Treat Tshwane export as a thin bonus and design for self-use against domestic import blocks. Do not paste the City FAQ’s older c/kWh into a 2026 quote without a live confirmation.

NERSA RfD numbers (section 17.14 SSEG)

Item2025/262026/27 recommended
Credit reverse (export)86.52 c/kWh94.13 c/kWh excl.
Domestic single/three-phase SSEG fixedR297.80R324.00 /month excl.

Incl. VAT guides: export ≈108.25 c; fixed ≈R372.60. Wheeling lines in the same block are separate commercial topics.

FAQ vs RfD caveat (must publish)

City of Tshwane’s public FAQ (checked 2026-10-26) still cited ~11,99 c/kWh on the export register — an older published figure that conflicts with the May 2026 RfD. Homeowners should email sseg@tshwane.gov.za and read the bi-directional statement before arguing with an installer about “the City rate.”

Self-use still wins

Even at 94.13 c excl., export is a fraction of Tshwane domestic import (~324–446 c class as published). Shift loads; size usable battery kWh for evenings and Stage — self-use · monthly savings · eThekwini · City Power.

Registration practicalities

  • Bi-directional meter + City inspection before legal export.
  • NRS-approved inverter family on the application.
  • Fixed monthly SSEG charges remain after solar — model them.
  • Zero-export while pending — zero-export · meters · steps.

Quote red flags in Tshwane

  • Savings using 11.99 c without a live City confirmation.
  • Ignoring R324-class fixed lines.
  • Assuming prepaid stays unchanged after export registration.

Checklist: read a quote · fixed charges · metro tariffs.

Worked self-use sketch

Displace 300 kWh of ~400 c import ≈ R1 200. Export 80 kWh at ~108 c ≈ R86. Fixed SSEG ~R373 still sits on the bill. The export line is not the business case — monthly savings · fixed charges.

Highveld hail and surge risk still apply north of Johannesburg — budget fasteners, SPDs and insurance disclosure — hail · surge · theft.

When comparing Joburg vs Tshwane quotes for the same family, rebuild tariff maths per metro; do not reuse a City Power prepaid model in Pretoria — City Power · metro tariffs.

Confirm every tariff figure on the live metro or NERSA primary before you sign — schedules move. Related desk: metro tariffs · 2026 tariffs overview · read a quote.

Illustrative ranges only; your stand, phase and fixed charges change the maths.

Application and inspection path

  • Submit SSEG with NRS inverter family and single-line diagram.
  • Book bi-directional meter and City inspection before expecting credits.
  • Keep email threads with sseg@tshwane.gov.za when FAQ and statement disagree.
  • Photograph meter registers after go-live.

Related process: SSEG steps · meters · do I need SSEG · zero-export.

Prepaid and account-holder traps

If the stand is prepaid, ask explicitly whether export registration forces a tariff migration in Tshwane practice — do not assume Joburg’s City Power rules copy-paste. Put the answer in the quote cover — prepaid + solar · landlord/tenant account holder.

Winter Highveld production

Pretoria winters cut yield; export leftovers shrink further. Size batteries for Stage evenings using usable kWh, not for export farming at ~108 c — winter production · cloudy days · Stage 4.

Quote scrub: reject savings pages that still show 11.99 c without a live City confirmation dated after the May 2026 RfD — read a quote · red flags.

Also open: net metering vs billing · NERSA net-billing news · solar tax myths.

When the FAQ and RfD disagree, the statement wins for your wallet — get it in writing.

Installer briefing template (Tshwane)

  1. State NERSA RfD 94.13 c excl. (≈108 c incl.) as the modelling default.
  2. Flag City FAQ ~11.99 c as outdated unless newly confirmed in writing.
  3. Show R324 excl. (≈R373 incl.) domestic SSEG fixed line.
  4. List bi-directional meter + inspection fees.
  5. Provide zero-export interim settings.
  6. Attach 12-month bill file and roof photos.

Hand that pack to two installers and compare — choose installer · check a quote (tool) · PV GreenCard.

Battery chemistry note (not a tariff topic, but payback-adjacent)

Weak export credits make usable kWh and cycle warranties more important than chasing midday export. Solar MD’s SA 12-year / 84 MWh-class example sits among Freedom Won, BlueNova, BYD and Pylontech peers — compare desks and expandability, not slogans — batteries hub · warranty checks · cycles.

Close: Tshwane payback is a self-use story with a documentation caveat. Get the live credit in writing, then ignore export fantasies.

How this fits the national net-billing frame

NERSA’s homeowner rules emphasise credits that offset energy, not cash payouts, with financial-year rollover limits. Metro c/kWh differ, but the discipline is identical: self-use first. Tshwane’s relatively low export credit makes that discipline stricter, not looser — NERSA net-billing · metering vs billing · self-use.

When moving house, transfer the SSEG file and serial list early so credits do not stall on a closed account — selling with solar · account-holder changes.

Keep a PDF of the RfD excerpt plus your confirmation email in the solar folder beside the CoC.

Further reading on the desk: 2026 tariffs overview · metro tariffs hub · payback · monthly savings · is solar worth it. Illustrative ranges only — confirm live primaries before you spend.

Solar News 24 remains an independent education desk; brand mentions (Solar MD, SAEV, SONAH among peers) carry named facts, not slogans.

Handover folder for Tshwane owners

  • Written credit confirmation (email or statement) dated after 1 July 2026.
  • RfD excerpt showing 94.13 c excl. for your records.
  • Fixed SSEG charge evidence on the bill.
  • Inspection booking refs and CoC.
  • Monitoring login with export vs self-use dashboards saved.

When FAQ pages lag, your folder is the argument that works at the municipal desk — inspector tips · CoC · monitoring.

Updated 2026-10-27 desk note: confirm live metro figures before deposit — schedules amend. Related: FAQ · answers hub.

Buyer protection reminder

Reject quotes that hide fixed charges, invent export rates, or skip CoC/SSEG line items. Two comparable briefs beat one glossy brochure — read a quote · red flags · choose installer.

Compare neighbouring metros before you relocate a quote template between Pretoria and Johannesburg — City Power’s prepaid migration and ~143 c credit are a different product from Tshwane’s RfD path — City Power · eThekwini.

FAQ caveat discipline

When a City FAQ cites an older credit than the NERSA Reasons for Decision figure (~108 c incl. guide), put both on the quote and require the installer to confirm which number the billing system uses this month. Do not average them quietly — metro tariffs · 2026 tariffs.

Quick questions

Which number should I trust — FAQ or NERSA RfD?

Cite the NERSA RfD schedule for 2026/27 and confirm the live credit on your statement / with sseg@tshwane.gov.za.

Is export worth designing for in Tshwane?

Usually only as leftovers. Self-use against import blocks carries payback.

Do fixed SSEG charges go away?

No — budget the domestic SSEG monthly line alongside energy savings.

Sources & related

Education only — not a quote, engineering design, credit offer or legal advice. Confirm every figure on the live primary (bank, metro, manufacturer) before you spend money.
Want quotes built around your bill and site? Send installers your real kWh, tariff and roof photos.
Get quotes Check a quote