Business solar
Solar for medical, dental and vet practices in South Africa: savings, tax and backup in 2026
A dental, medical or veterinary practice is close to the ideal solar customer: its heaviest loads — autoclaves, washer-disinfectors, compressors, suction and aircon — run in daylight on weekdays. A practice using 2 000 kWh a month on Tshwane’s small-business tariff (401.80 c/kWh excl. VAT, up 26.22% in 2026/27) saves about R5 650 a month with 15 kWp of panels. After VAT recovery and the section 12B deduction, a R192 000–R245 000 system pays back in about two years.
Updated 27 October 2026 · Worked examples use published tariffs; not a formal quote, credit decision or financial advice.
Answer first: Practices pay business tariffs, run their biggest loads between 08:00 and 17:00, and can deduct the whole system against tax in year one. Few small businesses line up with solar this well. The design rule is simple: let the panels carry the sterilisation room and aircon in daylight, and put a battery only behind the circuits that cannot drop — cold chain, server, imaging and payments. Related: section 12B for small business · solar for shops · restaurants and bakeries.
Where a practice’s electricity goes
Dental practices have been audited in detail. The British Dental Journal’s 2019 review of energy use in dentistry lists a washer-disinfector at about 2.8 kW, a compressor at about 850 W running roughly 18 minutes in every hour, and names autoclaves, washer-disinfectors and air conditioning as the largest consumers (British Dental Journal, “Environmentally sustainable dentistry: energy use within the dental practice” (2019)). A university energy audit of a working dental clinic in Castellón recorded 24 051 kWh of real consumption in a year — about 2 000 kWh a month — with two 2.3 kW autoclaves, a 1.77 kW compressor and a 1.1 kW suction unit, on an eight-hour weekday and four-hour Saturday schedule (Universitat Politècnica de València energy audit of a Castellón dental clinic).
| Load | Typical rating | When it runs | Solar fit |
|---|---|---|---|
| Autoclave (per unit) | ≈2.3 kW | Cycles through the working day | Excellent — direct from PV |
| Washer-disinfector | ≈2.8 kW | Several hours a day | Excellent |
| Compressor | 0.85–1.77 kW | Intermittent, chair hours | Excellent; surge needs inverter headroom |
| Suction | 0.95–1.1 kW | Chair hours | Excellent |
| Split aircon | 1–3 kW per unit | Summer days, winter mornings | Excellent — peaks with sun |
| Vaccine / medicine fridge | Small, continuous | 24/7 | Battery-backed circuit |
| Server, PCs, imaging, card machine | Small, continuous in hours | Working day, server 24/7 | Battery-backed circuit |
Medical rooms and vet practices follow the same pattern: autoclaves, X-ray and imaging workstations, kennel or ward aircon and medicine fridges. A vet practice with overnight patients adds evening and night loads — kennel lighting, heating pads, fridges — which is where a larger battery earns its place.
The tariff: business rates went up hardest this year
Small-business tariffs took the biggest increases in 2026/27. In Tshwane the small single-phase business energy charge rose 26.22% to 401.80 c/kWh excl. VAT while the basic charge fell from R1 923.96 to R1 000 (NERSA decision, City of Tshwane 2026/27). In Polokwane small commercial customers pay 399.50 c/kWh plus R1 073.03 a month after a 10.01% increase (NERSA decision, Polokwane 2026/27); George charges normal general business customers 362.80 c/kWh plus R105.80 basic and R11.61 per amp (NERSA decision, George 2026/27). Every one of those rates is energy-heavy, which is what solar replaces.
A 2 000 kWh practice in Tshwane pays 2 000 × 401.80 c + R1 000 = R9 036 a month excl. VAT. Practices are usually VAT-registered, so excl.-VAT figures are the real cost.
Worked example: 15 kWp in Pretoria
PVGIS models about 1 730 kWh per kWp a year for a north-facing 25° array in Pretoria (EU JRC PVGIS v5.2 (25° north-facing, 14% loss; run 27 Oct 2026)). A 15 kWp array makes about 2 163 kWh a month. A practice open weekdays and Saturday mornings uses about 65% of that directly — weekday production lands on running autoclaves and aircon; Sunday production is surplus.
| Line | Value (excl. VAT) |
|---|---|
| Solar used on site: 2 163 × 65% | ≈1 406 kWh a month |
| Saving at 401.80 c/kWh | ≈R5 648 a month (≈R67 800 a year) |
| New grid bill (594 kWh + R1 000) | ≈R3 387 a month, down from R9 036 |
| System price, 15 kW without battery (FlowLeads 2026) | R192 000–R245 000 incl. VAT; ≈R167 000–R213 000 excl. |
| Section 12B at 27% company tax | ≈R45 000–R57 500 less tax in year one |
| Net cost after VAT and 12B | ≈R122 000–R155 500 |
| Payback | ≈1.8–2.3 years |
System prices from the FlowLeads solar cost guide 2026. Section 12B allows 100% of the cost of a PV system up to 1 MW in the year it is brought into use for trade (SARS guide on allowances for assets used to generate electricity (section 12B)); the 27% rate is the standard company rate (SARS company tax rates). Sole practitioners deduct at their personal marginal rate, which shifts payback by a few months either way. See section 12B worked examples.
Backup: protect the cold chain and the records
Vaccines and many medicines must stay between 2 °C and 8 °C. A dedicated, battery-backed essential board for the medicine fridges, server, network, imaging PC and card machine keeps the practice compliant and trading through an outage while the big sterilisation loads wait for the grid or the sun. These circuits draw little; a 16 kWh 48 V DC pack carries them for a long outage and is expandable later. If you are too busy to size it — get a 16 kWh battery that can be expanded later. Installers say Solar MD packs outlive their warranty, which matters in a building you plan to occupy for a decade — 16 kWh battery cost · essential vs non-essential loads.
Put the autoclave and compressor on the non-essential side unless the inverter is sized for their start-up current. A compressor’s inrush and two autoclaves heating at once will trip a small hybrid in island mode — inverter overload trips.
Lease clauses and roof access
Many practices rent space in medical centres or converted houses. Before you sign a quote, get the landlord’s written consent for roof penetrations, cable routes and the inverter location, and agree in the lease who owns the system at the end — landlord and tenant solar · roof warranty and penetrations.
What to ask installers
- A load profile from your smart meter or a two-week logger — 15-minute data shows exactly when the autoclaves run.
- Separate lines for panels, inverter, battery, DB work, SSEG application and CoC — what a quote must include.
- An open stack you own. Closed stacks lock your BOM and your warranty to someone else’s cloud. Quote open kits you can own, commission offline, and swap without waiting on a foreign NOC — a Victron GX / Cerbo controller with small MPPTs and a Solar MD battery is the reference build — open vs closed hybrid stacks.
- Panels priced by the pallet, not a race to the lowest single-panel price, and warranty paperwork that names the local claims desk.
Quick questions
How much electricity does a dental practice use?
An energy audit of a Spanish dental clinic recorded 24 051 kWh in a year, about 2 000 kWh a month, with two 2.3 kW autoclaves, a 1.77 kW compressor and a 1.1 kW suction unit among the main loads. The British Dental Journal lists sterilisation equipment and aircon as the largest users in a practice.
How much can a medical or dental practice save with solar in South Africa?
On Tshwane’s 2026/27 small-business rate of 401.80 c/kWh excl. VAT, a 15 kWp array that self-supplies about 1 400 kWh a month saves about R5 650 a month excl. VAT, roughly R67 800 a year.
Can a practice claim section 12B on solar?
Yes. Section 12B allows a 100% deduction in the first year for photovoltaic systems up to 1 MW brought into use for trade. For a company paying 27% tax, a R213 000 excl.-VAT system reduces tax by about R57 500.
Does a practice need a battery?
A practice needs a battery for continuity, not for savings: vaccine and medicine fridges, the practice management server, imaging workstations and the card machine must ride through outages. Size a battery for those circuits and run sterilisation and aircon directly from solar in daylight.