Compliance

Do I need SSEG registration for rooftop solar in South Africa?

Yes if your system has a point of connection to the municipal or Eskom grid — even when you never export. NERSA guidance: ≤100 kW grid-connected SSEGs register with the distributor; larger systems register with NERSA. Truly off-grid systems with no grid connection are generally outside that registration path. Not legal advice.

Why registration exists

Safety for line workers, network planning, and correct metering/tariffs. A CoC alone is not the same as SSEG registration. NERSA’s February 2026 clarification (reported by Engineering News / SANews): grid-connected systems ≤100 kW register with the distributor; >100 kW register with NERSA; no grid connection means registration is generally not required under that notice.

Sources

What to put on the installer brief

  • SSEG application included?
  • Approved inverter evidence (NRS 097-2-1)
  • Meter change costs
  • Timeline for authorisation before export

Deep dive: SSEG registration article.